000109100 001__ 109100 000109100 005__ 20211216151749.0 000109100 0247_ $$2doi$$a10.1016/j.procir.2021.05.125 000109100 0248_ $$2sideral$$a125348 000109100 037__ $$aART-2021-125348 000109100 041__ $$aeng 000109100 100__ $$aGracia Grijota, C. 000109100 245__ $$aProduct development methodology "scalability" 000109100 260__ $$c2021 000109100 5060_ $$aAccess copy available to the general public$$fUnrestricted 000109100 5203_ $$aIn industrial manufacturing environments, where production requires a detailed product development, delivery times to customer are highly affected by the time required for development. Usually, product development takes long before arriving to the final solution Therefore, an improvement of the product development process can imply a very high potential in reducing the product delivery time to customer. This paper outlines a new product development methodology, based on the foundations of collaborative design and lean and agile methodologies. For that, we analyze and optimize the value stream of the product engineering process flow in a company of the sector of design, manufacturing, and commercialization of equipment in retail, through lean tools, to implement the “product scalability” concept. The case study shows a reduction of the product development lead time around 10-20%, regarding the present process, in the pilot tests conducted. Consequently, product development methodology “scalability” could have an enormous potential in reducing lead time and product development cost, in sectors with similar characteristics in terms of number of product variants and life cycles than the development of furniture and equipment for retail sector. 000109100 540__ $$9info:eu-repo/semantics/openAccess$$aby-nc-nd$$uhttp://creativecommons.org/licenses/by-nc-nd/3.0/es/ 000109100 655_4 $$ainfo:eu-repo/semantics/article$$vinfo:eu-repo/semantics/publishedVersion 000109100 700__ $$0(orcid)0000-0002-4917-8550$$aAcero, R.$$uUniversidad de Zaragoza 000109100 700__ $$0(orcid)0000-0001-7152-4117$$aYagüe Fabra, J.A.$$uUniversidad de Zaragoza 000109100 7102_ $$15002$$2515$$aUniversidad de Zaragoza$$bDpto. Ingeniería Diseño Fabri.$$cÁrea Ing. Procesos Fabricación 000109100 773__ $$g100 (2021), 571-576$$pProcedia CIRP$$tProcedia CIRP$$x2212-8271 000109100 8564_ $$s802699$$uhttps://zaguan.unizar.es/record/109100/files/texto_completo.pdf$$yVersión publicada 000109100 8564_ $$s2763575$$uhttps://zaguan.unizar.es/record/109100/files/texto_completo.jpg?subformat=icon$$xicon$$yVersión publicada 000109100 909CO $$ooai:zaguan.unizar.es:109100$$particulos$$pdriver 000109100 951__ $$a2021-12-16-13:12:26 000109100 980__ $$aARTICLE