Environmental assessment of Hellisheidi Geothermal power plant based on exergy allocation factors for heat and electricity production
Financiación H2020 / H2020 Funds
Resumen: The Hellisheidi geothermal power plant, located in Iceland, is a combined heat and power double-flash geothermal plant with an installed capacity of 303.3 MW of electricity and 133 MW of hot water. This study aimed to elucidate the environmental impacts of the electricity and heat production from this double-flash geothermal power plant. In this vein, firstly, the most updated inventory of the plant was generated, and secondly, a life-cycle assessment approach based on the exergy allocation factor was carried out instead of applying the traditionally used allocations in terms of mass and energy. The functional unit was defined as the production of 1 kWh of electricity and 1 kWh of hot water for district heating. The life-cycle stages included the (i) construction, (ii) operation (including abatement operations and maintenance), and (iii) well closure of the geothermal plant. All of the life-cycle stages from construction to dismantling were considered. Finally, the results on the partitioning of the environmental impact to electricity and heat with exergy allocations showed that most of the impact should be charged to electricity, as expected. Furthermore, the distribution of the environmental impacts among the life-cycle stages determined that the construction stage was the most impactful for the electricity and heat production. This result was attributable to the large consumption of steel that was demanded during the construction of the geothermal power plant (geothermal wells, equipment, and buildings). Impacts due to the abatement stage demonstrated that this stage satisfactorily reduced the total impact attributed to the three life-cycle stages of the geothermal power plant.
Idioma: Inglés
DOI: 10.3390/en16093616
Año: 2023
Publicado en: Energies 16, 9 (2023), 3616 [17 pp.]
ISSN: 1996-1073

Factor impacto SCIMAGO: 0.651 - Engineering (miscellaneous) (Q1) - Electrical and Electronic Engineering (Q2) - Energy (miscellaneous) (Q2) - Renewable Energy, Sustainability and the Environment (Q2) - Fuel Technology (Q2) - Control and Optimization (Q2) - Energy Engineering and Power Technology (Q2)

Financiación: info:eu-repo/grantAgreement/EC/H2020/818169/EU/Geothermal Emission Control/GECO
Tipo y forma: Article (Published version)
Exportado de SIDERAL (2024-07-05-12:48:17)


Visitas y descargas

Este artículo se encuentra en las siguientes colecciones:
articulos



 Notice créée le 2023-06-21, modifiée le 2024-07-05


Versión publicada:
 PDF
Évaluer ce document:

Rate this document:
1
2
3
 
(Pas encore évalué)