Long- and short-term efficiency in an automobile factory: An econometric case study
Resumen: This paper models the production technology of an automobile assembly plant as an integrated long and short-term relationship between inputs, labor and capital, and output, number of monthly assembled units. The parameters of the production function, elasticity of output to labor and capital, and the growth rate in total factor productivity (TFP), are estimated using the Error Correction Mechanism (ECR). The paper compares the TFP and the inverse of the hours per vehicle (HPV), the standard measure of productivity used in the industry, as indicators of operating efficiency of a production unit. The empirical application also highlights the potentialities of the ECM in insider and case study econometrics research, especially when the observed output and inputs of a production process deviate from the production technological frontier due to anticipated and unanticipated perturbations in the operations.
Idioma: Inglés
DOI: 10.1016/j.ijpe.2014.05.018
Año: 2014
Publicado en: INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS 156 (2014), 98-107
ISSN: 0925-5273

Factor impacto JCR: 2.752 (2014)
Categ. JCR: ENGINEERING, INDUSTRIAL rank: 1 / 43 = 0.023 (2014) - Q1 - T1
Categ. JCR: OPERATIONS RESEARCH & MANAGEMENT SCIENCE rank: 5 / 81 = 0.062 (2014) - Q1 - T1
Categ. JCR: ENGINEERING, MANUFACTURING rank: 4 / 39 = 0.103 (2014) - Q1 - T1

Financiación: info:eu-repo/grantAgreement/ES/DGA/CREVALOR
Financiación: info:eu-repo/grantAgreement/ES/MICINN/ECO2010-21393-C04-04
Tipo y forma: Article (Published version)
Área (Departamento): Área Organización de Empresas (Dpto. Direcc.Organiza.Empresas)
Exportado de SIDERAL (2024-02-06-14:45:25)


Visitas y descargas

Este artículo se encuentra en las siguientes colecciones:
articulos > articulos-por-area > organizacion_de_empresas



 Notice créée le 2024-02-06, modifiée le 2024-02-06


Versión publicada:
 PDF
Évaluer ce document:

Rate this document:
1
2
3
 
(Pas encore évalué)