Resumen: A 500 kW off-grid hybrid system based on renewable energies (PV and Wind) is designed to produce green hydrogen. This energy system includes a Battery Energy Storage System (BESS) to improve the grid stability. To control the power plant two strategies are assessed. First, a variable-load control is applied to the electrolyser, while the BEES control (with hysteresis) ensures that the power is not less than the minimum admissible in the electrolyser. A second control is developed to minimize electrolyser degradation. In this case, the electrolyser operates at constant power, allowing only very slow voltage variations. Idioma: Inglés DOI: 10.52152/4517 Año: 2025 Publicado en: Renewable Energy and Power Quality Journal 23, 6 (2025), 35-40 ISSN: 2172-038X Financiación: info:eu-repo/grantAgreement/ES/MICINN/CPP2021-008848 Tipo y forma: Artículo (Versión definitiva) Área (Departamento): Área Ingeniería Eléctrica (Dpto. Ingeniería Eléctrica)